These three services are often confused, requested interchangeably, and sometimes bundled — but they answer different questions.

ServiceWhat It AnswersTypical Scope
Short Circuit & Coordination StudyHow much fault current can flow, and are protective devices set correctly to isolate a fault quickly?Whole electrical system, usually a prerequisite for an accurate arc flash study
Arc Flash StudyWhat incident energy and PPE category applies at each piece of equipment?All (or a defined subset of) panels/buses in a facility, typically requires short circuit data as an input
Arc Flash Risk AssessmentWhat are the hazards and appropriate protective measures for a specific task or piece of equipment?Narrower/targeted — often used when a full facility study isn't yet available or isn't needed

Which One Do You Need?

If you've never had any electrical safety engineering done, most facilities start with a combined short circuit + coordination + arc flash study, since the first two are prerequisites for accurate arc flash numbers. If you already have a study on file and just need to evaluate a new piece of equipment or a specific task, a targeted risk assessment may be sufficient and less expensive.